Brink's EZChange Express

Order change online directly from Brink's for easy fulfillment and direct shipping to your stores.

Brink's EZChange Express Overview

Let your change orders come to you.

With this optional element of your Brink's Complete subscription, Brink's will deliver banknotes and coins from our vaults directly to your stores.

Direct shipments delivered to your door.

Direct delivery eliminates the need to transport change orders from the bank to your locations.

Rest assured with all‑risk protection.

All change orders are covered by our comprehensive cargo all‑risk protection policies.

Minimize funds stored on premise.

All banknotes and coins are shipped from Brink's cash vaulting facilities, reducing the amount of funds needed in your physical vaults.

More from our insights library:

From Chaos to Control: How CKE Transformed Cash Operations with Brink’s Complete

CKE Restaurants, the parent of Carl’s Jr. and Hardee’s, turned a fragmented, costly cash management process into a streamlined, scalable solution with Brink’s Complete. The result? Greater visibility, fewer vendors, and over $4 million in projected savings, setting the stage for smarter growth.

Read More

Commercial Security: How to Protect your Business, People, and Profits

Running a business is tough enough without worrying about theft, fraud, or break-ins. For many small business owners, security often slips to the bottom of the list until it is too late. From cash handling vulnerabilities to cyber threats, the risks are real, but so are the solutions.

Read the full blog to see how the right commercial security strategy can protect your people, profits, and peace of mind.

Read More

Biting into Better Cash Management: A Franchisee‘s Transformation

Late-night bank runs. Risky cash drops. Hours of lost time every week. That was everyday reality for Creative Foods Corporation, a Burger King and Popeyes franchisee in New York, until they discovered a smarter way. By partnering with Brink’s, they turned a major headache into a streamlined system that saves hundreds of hours a year, strengthens security, and gives managers peace of mind.

Read More